The foundation walls have been poured and the 1200SF of porch slab is being poured tomorrow morning at 6:30am.
Next week the sub floor gets put in; mud sill, TJI floor joists, sturdifloor sheathing etc.


I wired up 6 6V golf cart batteries in series and parallel to give us 660AH at 12V through a Xantrex 1000W inverter, charged from 3 15 Watt solar panels.